Keystone drill rig being unloaded in the Upper Nevis.
Keystone drill rig being unloaded in the Upper Nevis.
Image 1826
Keystone drill rig being unloaded in the Upper Nevis.
Page
1 of 1
Date
c1927
Source
Mr B McMillan - Bannockburn
Description
Keystone drill rig being unloaded in the Upper Nevis for the Upper Nevis Gold Dredging Co Ltd.
L to R:
1. unknown
2. Bill Dickey (blacksmith)
3. Harry
4. Henry
5. Ernie